Our Process
Our Process
In our process, we use the latest CNC machines, digital lasers to measure, and 3D rendering software to show our customers how the final project will look before fabrication. To place an order with DTK Stone Works, we require you to have the following completed:
- All cabinets must be completely installed
- All appliances (stove, dishwasher, refrigeration, etc.) must be on location
- The sink must be on site. DTK will take the sink back to our shop so that the sink cutout will be templated
If the above requirements are met, we can schedule to be onsite to template your project in the next few days.
Be aware that at the end of the templating stage, we require a 50%deposit based on the estimated price before we can continue with fabrication and installation.

Visit our showroom and fabrication facility in Wheeling, IL. We have an extensive collection of full-size stone slabs, materials, finishes, edge profiles, and custom detailing for you to choose from. We work with you to select the perfect material type, color, movement, and veining to bring your vision to life.

We take manual and laser measurements of your project, using the latest technology to ensure every detail is obtained. Our team will provide you with technical information and ensure that all details are taken care of. The measurements are converted to a 3D model and sent to you for approval. After final approval, we will start fabrication on our state-of-the-art, American-made CNC Jet saw and CNC router machinery to complete your project in just a few days.

Once the slabs of stone are cut and finished, we will confirm the installation date. After the stone is installed, we will clean up the space and ensure that you are 100% completely satisfied. If you are remodeling and have a countertop on your current cabinets, you may opt to allow DTK Stone Works to remove your old countertops at an additional cost. However, DTK is NOT specialized in plumbing or electricity.